日韩一本在线_久久伊人影视_免费一级肉体全黄毛片_色天天天天综合男人的天堂_三叶草GW4334

歡迎光臨,深圳市東勝達(dá)偉業(yè)科技有限公司官網(wǎng)!
Industry dynamics
當(dāng)前位置:首頁 ? News ? Industry dynamics

How to lay the floor heating waterproof line?

時(shí)間:2021-12-06| 作者:Admin

Geothermal heating is one of the commonly used heating measures in northern households, which is very helpful for winter. It can be configured not only in living rooms and bedrooms, but also in kitchens and bathrooms. But waterproof and moisture-proof measures should be taken, otherwise it will have a significant impact on the service life of geothermal energy. So how to lay the floor heating waterproof line?

地暖防水線

1. Firstly, it is necessary to handle the floor heating laid on the ground, keep the ground clean, dry, and level, and then apply waterproof paint to prevent geothermal pipes from seeping into the downstairs. After the paint is dry, an insulation layer can be laid to prevent the waterproof film from generating odor when heated. Then lay geothermal pipes, lay a layer of composite film on the surface to isolate moisture, and finally lay the floor.
2. Precautions for floor heating construction.
① Pay attention to floor heating materials
Floor heating is a concealed project. Improper selection of underfloor heating materials, if there are quality issues or short service life, will affect the use and cause huge losses. Therefore, geothermal materials should be inspected before construction. The surface of high-quality floor heating pipes is smooth, without bumps, bubbles, or obvious color differences, and the hardness is moderate.
② Pay attention to on-site measurement
Before the construction of underfloor heating, it is necessary to find a professional installation company to analyze on-site measurements, as not every student's home or any functional area is suitable for installing underfloor heating. If installed in an inappropriate location, it is easy to encounter problems. Usually, a more reasonable design solution is needed.
③ Pay attention to the coil
Strict care must be taken during construction. The coil should pay attention to the distribution spacing, and the corners should not be bent to ensure the uniformity and stability of heat dissipation. During the construction process, the airtightness of the system should be checked at any time, and the water injection pressure test should not be ignored.

在線客服

微信公眾號
服務(wù)熱線:138-2529-3326
济源市| 乌兰察布市| 扬州市| 札达县| 濉溪县| 成武县| 巴林左旗| 开鲁县| 澄江县| 南川市| 会昌县| 浑源县| 平谷区| 沈丘县| 辽宁省| 安乡县| 台中县| 科技| 公主岭市| 玛纳斯县| 临泽县| 仁化县| 大冶市| 丰顺县| 斗六市| 龙江县| 安康市| 乾安县| 华容县| 长治市| 辰溪县| 渭源县| 兰溪市| 黄大仙区| 呼玛县| 南阳市| 融水| 黄浦区| 页游| 信宜市| 务川|